🧵 The sewing line stuck at 70 pieces an hour

A T-shirt line in Tiruppur has a target of 100 pieces an hour for an export order. It gives 70, and the order ships in 10 days. The supervisor wants all operators to do 2 hours of overtime.

திருப்பூரில் ஒரு T-shirt line-க்கு மணிக்கு 100 target, ஆனால் 70 தான் வருது. Supervisor எல்லோருக்கும் overtime என்கிறார். Bottleneck எது?

Step 1 of 4

Here is the time study, one operator per operation. Tap the bottleneck operation.

Operation breakdown: tap a line